4.  The Canine Gourmet Company produces delicious dog treats for canines with discriminating tastes. Management wants the box-filing line to be set so that the process average weight per packet is 45 grams. To make sure that the process is in control, an inspector at the end of the filling line periodically selects a random box of 10 packets and weighs each packet. When the process is in control, the range in the weight of each sample has averaged 6 grams.

4.A: Design an R- and an xbar- chart for this process.

4.B: The results from the last 5 samples of 10 packets are:

Sample                 xbar            R

1                              44           9

2                              40           2

3                              46           5

4                              39           8

5                              48           3

Is the process in control? Explan why.

 

 

 

5. Aspen Plastics produces plastic bottles to customer order. The quality inspector randomly selects four bottles from the bottle machine and measures the outside diameter of the bottle neck, a critical quality dimension that determines whether the bottle cap will fit properly. The dimensions (in.) from the last six samples are:

Sample                 1                              2                              3                              4

1                              0.594                     0.622                     0.598                     0.590

2                              0.587                     0.611                     0.597                     0.613

3                              0.571                     0.580                     0.595                     0.602

4                              0.610                     0.615                     0.585                     0.578

5                              0.580                     0.624                     0.618                     0.614

6                              0.585                     0.593                     0.607                     0.569

5.A: Assume that only these six samples are sufficient, and use the data to determine control limits for an R- and an xbar- chart.

 

 

 

11. Jim’s Outfitters, Inc., makes custom fancy shirts for cowboys. The shirts could be flawed in various ways, including flaws in the weave or color of the fabric, loose buttons or decorations, wrong dimensions, and uneven stitches. Jim randomly examined 10 shirts, with the following results:

 

Shirt                       Defects

1                              8

2                              0

3                              7

4                              12

5                              5

6                              10

7                              2

8                              4

9                              6

10                           6

 

11.A: Assuming that 10 observations are adequate for these purposes, determine the three-sigma control limits for defects per shirt.

11.B: Suppose that the next shirt has 13 flaws. What can you say about the process now?

 

 

17. Webster Chemical Company produces mastics and caulking for the construction industry. The product is blended in large mixers and then pumped into tubes and capped. Management at Webster is concerned as to whether caulking tubes are being properly capped. If a significant proportion of the tubes are not being sealed, Webster is placing its customers in a messy situation. Tubes are packaged in large boxes of 144. Several boxes are inspected, and the following numbers of leaking tubes are found:

Sample                Tubes

1                              3

2                              5

3                              3

4                              4

5                              2

6                              4

7                              2

8                              6

9                              4

10                           9

11                           2

12                           6

13                           5

14                           1

15                           5

16                           0

17                           2

18                           6

19                           2

20                           1             

Total                      7

17.A: Calculate p- chart three-sigma control limits to assess whether the capping process is in statistical control.

Subject Mathematics
Due By (Pacific Time) 10/27/2013 03:00 pm
Report DMCA
TutorRating
pallavi

Chat Now!

out of 1971 reviews
More..
amosmm

Chat Now!

out of 766 reviews
More..
PhyzKyd

Chat Now!

out of 1164 reviews
More..
rajdeep77

Chat Now!

out of 721 reviews
More..
sctys

Chat Now!

out of 1600 reviews
More..
sharadgreen

Chat Now!

out of 770 reviews
More..
topnotcher

Chat Now!

out of 766 reviews
More..
XXXIAO

Chat Now!

out of 680 reviews
More..
All Rights Reserved. Copyright by AceMyHW.com - Copyright Policy