Project #28354 - Dewatering Method

 

Dewatering Plan

 

2) Below figure representative of soil condition at a construction site, if you were a contractor select a dewatering method you would consider appropriate for the project described below.

 

Describe in detail how your system would be built and operated.

 

A) 1200 feet of an 18” inch sewer line is to be placed in a trench about 16 feet below ground surface.

 

B) A 30 foot diameter concrete pump station is to be founded on the basalt rock at 65 feet in depth.

**The textbook gave answers to A) to use sump pump and B) use Caisson.

 

 

 

Textbook:

 

Soils in Construction, 5th ed., by Schroeder, 2004, Pearson, ISBN 0-13-

 

 

 

048917-4.

 

 

 

 

 

 

Subject Science
Due By (Pacific Time) 04/22/2014 02:20 pm
Report DMCA
TutorRating
pallavi

Chat Now!

out of 1971 reviews
More..
amosmm

Chat Now!

out of 766 reviews
More..
PhyzKyd

Chat Now!

out of 1164 reviews
More..
rajdeep77

Chat Now!

out of 721 reviews
More..
sctys

Chat Now!

out of 1600 reviews
More..
sharadgreen

Chat Now!

out of 770 reviews
More..
topnotcher

Chat Now!

out of 766 reviews
More..
XXXIAO

Chat Now!

out of 680 reviews
More..
All Rights Reserved. Copyright by AceMyHW.com - Copyright Policy