Project #36105 - Fire Dynamic

Show all calculations and use an EXCEL spreadsheet

1. - You are hired by an industry that owns a building with a floor area of 6 m by 10 m and a ceiling height of 4 m. The walls, floor, and ceiling are concrete 15 cm thick. Gasoline is spilled on the floor and ignites due to a worker casually lighting a cigarette. The building has a door which is 1.2 m wide by 2.5 m high.

(a) What is the energy release rate at flashover (MW)?

(b) What is the maximum area of spill (m2) if flashover is to be prevented?

Note: Perform your calculations 10 minutes after ignition and use combustion efficiency of 0.7.

2 .- A room has dimensions of 20 m by 20 m by 3.05 m high. A fire develops in the room with a constant energy release rate of 900 kW. Compute the time (sec) that it will take the smoke layer to be 1.5 m from the floor for two conditions: (a) when leakage areas are located at floor level; and (b) when the leakage is at roof level.

3. - A closed room is 5 m high and contains a fire with a plume mass flow rate of 5 kg/s at a height of 2.5 m and an upper layer temperature of 400oC. There is an opening at floor level 1 m wide and 2.5 m high. Your assignment is to find the required ceiling ventilation area if the smoke is not to come closer than 2.5 m from the floor.

Subject Science
Due By (Pacific Time) 07/23/2014 07:00 pm
Report DMCA
TutorRating
pallavi

Chat Now!

out of 1971 reviews
More..
amosmm

Chat Now!

out of 766 reviews
More..
PhyzKyd

Chat Now!

out of 1164 reviews
More..
rajdeep77

Chat Now!

out of 721 reviews
More..
sctys

Chat Now!

out of 1600 reviews
More..
sharadgreen

Chat Now!

out of 770 reviews
More..
topnotcher

Chat Now!

out of 766 reviews
More..
XXXIAO

Chat Now!

out of 680 reviews
More..
All Rights Reserved. Copyright by AceMyHW.com - Copyright Policy